[Text valid from 18-09-2016 until 29-09-2017] The Minister of Transport, Public Works and Water Management, Having regard to the Articles 1, second paragraph, 8, 11, 15, 32, 35, 38 of the Decree Prevention of Pollution from Ships, Article 2 of the Port Reception Facilities Decree...
Search
Search
4743 resultaten
An oil tanker of 150 GT or more also complies, in addition to the requirements of Annex I to the Convention that are applicable pursuant to Article 5, first paragraph, of the Decree, with the requirements of Regulation (EU) 530/2012.
The requirements as referred to in Article 18.8.2 of Annex I to the Convention are the requirements, incorporated in resolution A.495(XII).
The requirements, as referred to in Article 30.6.5.2 of Annex I to the Convention, are the requirements included in the specifications for the design, the installation and operation of a partial-flow system for the arrangement of overboard discharges, which have been attached to this Regulation...
The following ships have been provided with arrangements for discharging sanitary waste in accordance with the requirements given in Annex IV to the Convention: existing ships as referred to in Article 5, fourth paragraph, items c and d, of the Decree with a date of...
The Minister may, with due regard for the provisions to that end in the code, resolutions, directives and orders that are applicable on the basis of this Regulation, allow deviation from the requirements as referred to in the Articles 3, 4 and 5b through 5e...