1.In this Regulation the following terms shall have the following meanings: anniversary date: a day and month of each year that correspond with the date of expiry that is situated between the date of issue and the date of expiry of a certificate; Caribbean-Dutch ship...
Search
Search
4743 resultaten
1.For mobile offshore drilling units as referred to in the MODU Code 1979, the MODU Code 1989 and the MODU Code 2009, the following certificates are required: for drilling units, built before 1 May 1991: the mobile offshore drilling units safety certificate, belonging to the...
1.For cargo ships regarding which on the basis of Article 12b has been opted for application of the CCSS Code, the safety certificate belonging to that Code is required. 2.The certificate as referred to in the first paragraph replaces the national safety certificate.
1.For a passenger ship engaged on international voyages and regarding which on the basis of Article 12c has been opted for application of the SCV Code, a copy of the notification to the IMO regarding the equivalency of the SCV Code (notification of equivalency) is...
1.For a cargo ship of less than 24 metres which is solely engaged on voyages in the Caribbean Trading Area, the SCV safety certificate, belonging to the SCV Code, is required. 2.The certificate as referred to in the first paragraph replaces the national safety certificate.
1.For a ship regarding which on the basis of Article 12 has been opted for application of the DSC Code, the SPS Code or the SPS Code 2008, the certificate belonging to the relevant Code is required. If has been opted for application of the...
1.Article 9, first clause, preamble and item a, and the second clause, of the Decree is equally binding to passenger ships as referred to in Article 2, fourth clause, of ordinance (EC) 336/2006, cargo ships of 500 GT or more and mobile offshore drilling units...
The person who has performed the survey places an annotation on the certificate of the surveys to which a ship pursuant to the Articles 9a through 12d and 13, third clause, has been subjected during the period of validity of a certificate.
The requirements as referred to in paragraph 1 of Annex 3c apply to ships as referred to in Article 3a, first paragraph, item f: for which the building contract is concluded on or after 15 December 2019;of which, in the absence of a building contract...